Main Framework » History » Revision 3
Revision 2 (Francois Soulard, 08/06/2024 07:20 PM) → Revision 3/15 (Francois Soulard, 08/06/2024 07:20 PM)
# Main Framework ### Timetable proposed by Traversées (original tender) (tender) * [Last week of July 2024]: Building up of the digital infrastructure. > * Setup of a new dedicated server located in Europe (Hetzner or OVH with a hardware profile close to CPU 40 cores, RAM 128Gb, NVMe SSD disks). > * Setup of a scalable virtualization environment (based on the open technologies Proxmox, KVM, LXC). > * Configuration of a working digital environment splitted into a production server and a development server, featuring tools for collaboration and code building (Redmine, GIT). > * Setup of a security backup and server monitoring policy (Zabbix). * [Weeks 1 and 2 of August 2024]: Coordination and installation of the main core of Moodle, duplicating the configuration of edu.ripess.eu. > * Briefings with the project’s coordination (identification of contacts, semantic updating of the project, planning). > * Installation of the core components and extensions of Moodle (internationalization, Big Blue Button, monitoring) using the model built for edu.ripess.eu. > * Installation and testing of a Big Blue Button/Fair Blue virtual server (or a cluster of servers if it is necessary to host up to 300-400 simultaneous participants). > * Graphic customization of the Moodle interface according to the existing visuals of the YOU CARE project and other institutional brands. * [Week 3 of August 2024]: Tests and adaptation of Moodle and first internal learning session for administrators. > * Customization of the server for a high-performance rendering, able to host more than 1000 users and up to 200 video conferencing participants (caching, optimization of SQL, PHP, Apache/Nginx, eventually load balancing and multi-servers). > * Installation of a Big Blue Button streaming extension, to be connected with the open video server Peertube. > * Installation of a self-hosted Peertube video server (with a high performance configuration). > * Configuration of a Moodle’s common extension for users’ monitoring and statistics. * [Month 9-12 of 2024]: Training and enhancement of the platform to an assembly functionality > * Feasibility of creating a task group of facilitators of the platform. > * Installation and testing of a forum/assembly functionality, based on Matrix (instant messaging integrated to Moodle 4.3), or Discourse (advanced community forum and knowledge base). > * Development of missing or additional functionalities; improvement of graphic templates. > * Trainings of the project’s coordination (and eventually the facilitators group). * [Month 1-6 of 2025]: Reporting, training and supervision of the platform > * First report based on statistics, shared contents in the platform and emerging interactions. > * Supervision and maintenance of the platform (core and components optimization, security checking). > * Activation of the participative assembly module (March 2025). > * Trainings and a working group of the project’s coordination (and eventually the facilitators group). * [Month 6-12 of 2025]: Reporting, training and supervision of the platform > * Second report based on statistics, shared contents and emerging interactions. > * Trainings of the project coordination (and eventually the facilitators group). > * Maintenance of the platform (core and components update, security checking). * [2026-2027]: Reporting, training and supervision of the platform.